Weir Minerals

The overall project comprised the installation of a new industrial unit. 172 CSA piles were installed in the ground to support the footprint of the
Building to support the weight of the machinery that will be being used in the Building and also because it was constructed on an old river bed.

A Mezzanine Floor was installed 9 meters above ground level. As the Unit was attached to a Foundry an intumescent paint was used to protect the steel against fire.

Health and Safety was closely monitored on this project because Weir Minerals was in full use throughout the works being carried out.

Client Satisfaction Score: 9/10

“This was a difficult project, client, project manager, weather and difficult site access, a successful outcome. Job well done!”
Luke Harbour, Thomasons

Share this project
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
© Copyright 2022 PLP Construction Limited. Privacy policy & terms.
  • Twitter
  • Mail
  • Home
  • About
  • Recent Projects
  • Latest News
  • Contact
Didsbury Rugby Club Offerton High School
Scroll to top